Capabilities Based Planning is Planning, under uncertainty, to provide capabilities suitable for a wide range of modern-day challenges and circumstances while working within an economic framework that necessitates choice.
This process requires making estimates of cost, schedule, and technical performance to increase the probability of program success as defined by with Measures of Effectiveness, Measures of Performance, Technical Performance Measures, and Key Performance Parameters. All operating in the presence of reducible and irreducible uncertainty.